11.202511.2025 Competition 1st place (1st mention) in the multidisciplinary competition for the Charbonnière footbridge in Collombey-Muraz (VS)
11.202511.2025 Competition 2nd prize in the multidisciplinary competition for the Gryonne footbridge in Monthey (VS)
11.202511.2025 Competition First mention (second place) in the multidisciplinary competition for the Illarsaz footbridge in Aigle (VD)
11.202511.2025 Competition PIERRE-ALAIN DUPRAZ ARCHITECTES distinguished itself by finishing 1st, 2nd and 2nd in the three footbridge competitions (Charbonnière, Gryonne and Illarsaz respectively) as part of the 3rd correction of the Rhône.
10.202511.2025 Event The ‘La Fabrique Caran d’Ache’ project unveils its new perforated aluminium façades
09.202510.2025 construction START OF CONSTRUCTION and laying of the foundation stone for the future headquarters and factory of Caran d’Ache in Bernex
09.202510.2025 construction START OF CONSTRUCTION WORK ON THE FOOTBRIDGE OVER THE DRIZE RIVER IN VIDOLLET-LA-FORGE (GE)
05.2025 Competition FINALIST in the two-stage architectural competition for the Physical Sciences and Mathematics Centre at the University of Geneva
05.202505.2025 Event Voters in the commune of Troinex have said ‘yes’ to the soft mobility footbridge over the Drize at Vidollet-la-Forge (GE)
05.202511.2025 Event Obtaining planning permission for the construction of the Caran d’Ache factory in Bernex, Geneva
04.202504.2025 Competition 1st prize in the pre-selection architectural competition for the multi-purpose hall and cultural centre in Onex (GE)