News 05.2024 construction Night-time installation of the two main sections of the steel structure of the pedestrian and cycle bridge over the RC179 in Crissier (VD) All News Competitions The Drague bridge, Sion The Caran d’Ache factory, Geneva Cité de la Musique of Geneva Development of La Rade, Geneva PAV Etoile, Geneva Footbridge of La Rade, Geneva All competitions Built projects Residential buildings, Vandoeuvres Nursery school and childcare centre, Prangins Passerelle de la Paix, Geneva Modular villa, Collonges-Sous-Salève Villa extension, Vandoeuvres Crèche de Saint-Jean, Geneva All built projects
05.2024 construction Night-time installation of the two main sections of the steel structure of the pedestrian and cycle bridge over the RC179 in Crissier (VD)